TECHNICAL SELECTION
Technology selection is not about choosing a machine;
Instead, review a long-running system.
Here is a collection of Olten's core descriptions of continuous systems, equipment parameters, operational verification, project calculations and business collaboration. Please start browsing with the question you most need confirmation at the moment.
01 / Topic Selection
Entering into a core selection issue
The five information windows are arranged in the same reading order as the subdirectories: first verify, then confirm the equipment and system, and finally enter the boundary between economics and business.
Next: Selection Information
Prepare the raw materials, target products and project conditions before entering the program communication.
Please provide raw materials, scale, target products, project location and current on-site conditions. Based on this, Olten will confirm the scope of data that can be accessed, the pace of communication, and whether it is necessary to enter the design development or FEED design stage.