LEVEL 1PRE-FEASIBILITY
Pre-assessment
- Equipment selection reference and processing capacity boundaries
- Material input/output and energy consumption balance discussion
- Basic ROI Calculation Framework and Typical Case Data
ENGINEERING DELIVERY / FEED
The engineering data shall be matched to the project stage. Through preliminary evaluation, design development and FEED engineering customization, Olten gradually organized the project input, design boundary and construction interface into a reviewable landing path.
Level 3 Data Delivery
Each stage corresponds to different information integrity and engineering responsibility boundaries. First use basic data to establish judgment, and then go into details around specific plots, interfaces and construction conditions to avoid outputting drawings or commitments without engineering significance when the prerequisites are insufficient.
LEVEL 1PRE-FEASIBILITY
LEVEL 2CONCEPT DEVELOPMENT
LEVEL 3FEED ENGINEERING
ENGINEERING EVIDENCE WINDOW
Project landing boundary
Next: Submit project criteria
Please provide raw materials, scale, target products, project location and current on-site conditions. Based on this, Olten will confirm the scope of data that can be accessed, the pace of communication, and whether it is necessary to enter the design development or FEED design stage.