ENGINEERING DELIVERY / FEED

FEED DESIGN AND
Project implementation process

The engineering data shall be matched to the project stage. Through preliminary evaluation, design development and FEED engineering customization, Olten gradually organized the project input, design boundary and construction interface into a reviewable landing path.

Level 3 Data Delivery

The information will not be given all at once;
Rather, it gradually deepens with the clarity of the project.

Each stage corresponds to different information integrity and engineering responsibility boundaries. First use basic data to establish judgment, and then go into details around specific plots, interfaces and construction conditions to avoid outputting drawings or commitments without engineering significance when the prerequisites are insufficient.

LEVEL 1PRE-FEASIBILITY

Pre-assessment

First, establish a discussable technical scope with public materials, basic selection and project conditions.
  • Equipment selection reference and processing capacity boundaries
  • Material input/output and energy consumption balance discussion
  • Basic ROI Calculation Framework and Typical Case Data
After registering the company's basic project information, enter the preliminary information communication

LEVEL 2CONCEPT DEVELOPMENT

Plan deepening

When the project conditions are gradually clear, then enter the conceptual planning for specific plots and interfaces.
  • Bilingual NDA and Project Information Protection
  • Conceptual planning of 3D flow lines for specific plots
  • Main production line desensitization process and interface discussion
After completing the project initiation verification and confirmation of intention, enter the design development

LEVEL 3FEED ENGINEERING

Custom Engineering (FEED)

Based on the engineering design agreement, organize the core drawings and cross-professional interfaces required for construction deepening.
  • P&ID, piping interfaces, and process elaboration documentation
  • Foundation load-bearing and civil loading conditions
  • Electrical topology, control and construction deepening boundaries
Delivery after signing the engineering design agreement; the cost will be offset by the formal procurement agreement
Olten Engineering Equipment and Project Deployment Evidence

ENGINEERING EVIDENCE WINDOW

The implementation of the project requires the establishment of data, interfaces and responsibility boundaries.

From the verification of project conditions to the deepening of construction, the engineering team will confirm the scope of data and the next action according to the current stage, so that each deepening has clear input and traceable output.

Project landing boundary

Let each time deepen,
All are based on real project conditions.

INPUT / PROJECT INPUTRaw material characteristics, processing scale, target products, project site and utility conditions.
BOUNDARY / Design BoundarySite interface, compliance requirements, construction conditions, logistics and scope of collaboration between both parties.
OUTPUT / DELIVERABLESMaterials, drawings, communication rhythms and engineering deepening actions that match your stage.

Next: Submit project criteria

Submit project conditions,
Enter the adapted data delivery stage.

Please provide raw materials, scale, target products, project location and current on-site conditions. Based on this, Olten will confirm the scope of data that can be accessed, the pace of communication, and whether it is necessary to enter the design development or FEED design stage.

WhatsApp Instant Consultation