Global TimeBeijing--:--:--Dubai--:--:--Moscow--:--:--London--:--:--New York--:--:--Singapore--:--:--
/
← Back to Main Businesses

SOLUTION / 05 · SYSTEM RETROFIT · CONTINUOUS OPERATION

System-level upgrade of old production lines

In view of the problems of old lines such as failure of rotating mechanical seals, blockage of combustible gas paths, high energy consumption, uneven temperature control and frequent shutdowns, system diagnosis rather than single component replacement is used to promote hierarchical upgrades.

PROJECT CONTEXT

Applicable project conditions

01Carbonization, pyrolysis or activation equipment that has been put into production but is unstable
02Problems with air leaks, blocked pipes, uneven products, high energy consumption, or insufficient cooling
03Projects that want to retain some of their existing assets and restore effective capacity

OLTEN ENGINEERING MODULES

How engineering and business messages are communicated

Let key capabilities enter the engineering boundary and return to project facts item by item.

01

On-site diagnosis

Locate key issues based on operating records, air path, temperature control, sealing, and product data.

02

Graded renovation

Tiered organization of emergency safety, effective capacity and long-term system upgrades.

03

Review Run

Validate the transformation value with continuous operation, energy consumption, product and maintenance cycles.

Project knowledge/Material Review Points

From the business concept back to the project judgment,
Review these engineering and commercial conditions first.

Return to project facts and answer them item by item.

01

Start with real project inputs

Confirm raw material sources, moisture content, ash content, target carbon materials, product quality and downstream applications.

02

Then review system capabilities

Sealing, gas circuits, cooling and control common services for long-term continuous working conditions.

03

Finally, review delivery conditions

Quality, testing, channels, compliance, logistics and agreements bring the technical pathway into a real project.

OLTEN DELIVERY APPROACH

Engineering and Commercial Phases Olten Can Participate In

Equipment configuration, engineering plans, material testing, product distribution and cooperation scope are subject to confirmed project information, site conditions and written documents agreed by both parties.

Submit project conditionsBack to Six Main Businesses
01Locate key issues based on operating records, air path, temperature control, sealing, and product data.
02Tiered organization of emergency safety, effective capacity and long-term system upgrades.
03Validate the transformation value with continuous operation, energy consumption, product and maintenance cycles.
WhatsApp Instant Consultation