Global TimeBeijing--:--:--Dubai--:--:--Moscow--:--:--London--:--:--New York--:--:--Singapore--:--:--
/
← Back to Main Businesses

SOLUTION / 02 · BIOCHAR · CARBON CREDIT PREPARATION

Biochar & International Carbon Credits

Using agricultural and forestry residues as a starting point, stable biochar is prepared through sorting, drying and continuous pyrolysis, and quality, energy consumption and dMRV data are prepared according to applicable national and international rules around soil, building materials, metallurgy and carbon removal applications.

PROJECT CONTEXT

Applicable project conditions

01Rice husk, straw, sawdust, bamboo, coconut shell, palm shell and other agricultural and forestry residues
02Application paths of biochar for soil, building materials, metallurgical biochar and carbon removal projects
03Project parties who need to establish evidence chains for raw materials, processes, quality and dMRV

OLTEN ENGINEERING MODULES

How engineering and business messages are communicated

Let key capabilities enter the engineering boundary and return to project facts item by item.

01

Pretreatment and continuous pyrolysis

Evaluate the sustainability of raw materials, moisture content, transportation radius, energy consumption boundaries of drying and continuous pyrolysis.

02

Biochar utilization

Discuss stability, quality and application boundaries around soil, building materials, metallurgy and other applicable directions.

03

Carbon credit preparation

Prepare project data around dMRV, applicable rules, quality data and third-party verification.

Project knowledge/Material Review Points

From the business concept back to the project judgment,
Review these engineering and commercial conditions first.

Return to project facts and answer them item by item.

01

Traceability of raw materials

Source, transportation, pre-processing and batch records are the common starting point for project data and application judgment.

02

Product first characterization

Fixed carbon, ash, stability and applicable pollutant indicators shall be confirmed according to the target application and applicable rules.

03

Carbon value post-positioning

Methodology, verification, registration and buyer conditions jointly determine whether the carbon value can be entered into the project model.

OLTEN DELIVERY APPROACH

Engineering and Commercial Phases Olten Can Participate In

Equipment configuration, engineering plans, material testing, product distribution and cooperation scope are subject to confirmed project information, site conditions and written documents agreed by both parties.

Submit project conditionsBack to Six Main Businesses
01Pyrolysis temperature, FEED, energy consumption, product and batch data collection
02Review thermal cycle, material yield and application path based on energy conservation
03The host country’s carbon market and international carbon credit rules are evaluated based on project conditions, applicability and third-party verification requirements
WhatsApp Instant Consultation